Scheduled Phone System Maintenance - September 23rd more info...

Standard Construction Details
These documents were last revised in 2008.
Search Standard Construction Details
Type to begin your search, or browse the list below.
Clear Search
Sewer Details
Jump to: • Sewer • Potable Water • Reclaimed Water • Miscellaneous • Roadway • Storm Drainage
Click on the file icons below to download specific files.
 S-1 Sanitary Sewer Design Notes
 S-2 Sanitary Sewer Construction Notes
 S-3 Lift Station Wet Well Design Notes
 S-4 Lift Station Wet Well Construction Notes
 S-5 Sanitary Sewer Approved Products
S-6 Standard Manhole
S-7 Sanitary Sewer Cover and General Notes
S-8 Shallow Manhole
S-9 Outside Drop Manhole (Standard New Construction)
S-10 Outside Drop Manhole (Standard)
S-11 Outside Drop Manhole (Retrofit Only)
S-12 Inside Drop Manhole (Retrofit Only)
S-13 Rubber Boot and Precast Joint Connection
S-14 Storm Drainage Crossing/Sanitary Lateral Pipe Crossing
S-15 Sewer Lateral
S-16 Cleanout
S-17 Locator Tape/Tracewire Installation for Sewer Water and Reclaimed Water Pipelines
S-18 Sewer/Water/Drainage Crossing
S-19 Typical Lift Station Site Plan
S-20 Typical Lift Station Site Plan
S-21 Lift Station Potable Water Service (Where Reclaim Water Not Available)
S-22 Lift Station Wet Well
S-23 Lift Station Emergency Pump Connection
S-24 Packaged Lift Station Electrical Equipment Rack
S-25 Packaged Lift Station Electrical Service Schematic
S-26 Sanitary Sewer Force Main Valve and Valve Box
S-27 Type A Bedding and Trench (Special Gravity Sewer Installations)
S-28 Type B Bedding and Trench (Typical for Water, Sewer, Forcemain, Stormdrain, and Reclaimed Water Main Installation)
S-29 Sanitary Sewer Double Manhole Cover
S-30 Standard Air Release Valve Assembly (Vertical Pipe Layout)
S-31 Sewer Air Release Valve Assembly with Odor Control System (Vertical Pipe Layout)
S-32 Standard Air Release Valve Assembly Above Ground Vertical Pipe Layout
S-33 Sewer Air Release Valve Assembly with Odor Control System and Cover Above Ground Offset Pipe Layout
S-34 Air Release Valve Underground (Force Mains) Traffic Style
 
Potable Water Details
Jump to: • Sewer • Potable Water • Reclaimed Water • Miscellaneous • Roadway • Storm Drainage
Click on the file icons below to download specific files.
 W-1 Potable Water Design Notes
 W-2 Potable Water Construction Notes
 W-3 Potable Water Approved Products
W-4 Fire Hydrant Assembly
W-5 Potable Water Valve and Valve Box (4-16-inch Valve Sizes)
W-6 Tapping Valve and Sleeve
W-7 Air Release Valve Pit
W-8 Meter Box Layout
W-9 Water Service (Meter Sizes 3/4-1 inch)
W-10 Multiple Water Services Connection Detail for Commercial Use Only
W-11 Water Service (Meter Sizes 1 or 2 inch)
W-12 Water Service with Backflow Preventer (Meter Sizes 3 or 8 inch)
W-13 Potable Water Blow Off Assembly
W-14 PVC to HDPE Restrained Joint
W-15 Backflow Preventer (Reduced Pressure) 3-8 inch
W-16 2 inch Backflow Preventer
W-17 Conduit Crossing R.R. or Roadway
W-18 Conduit Crossing R.R. or Roadway
W-19 Storm Drainage Pipe or Sanitary Sewer Main Conflict
W-20 Storm Drainage Pipe or Sanitary Sewer Main Conflict
W-21 Main Installation Between Drainage Inlet and Sidewalk
W-22 Non-Standard Water Meter Box (Meter 3 inch and Larger Sizes)
W-23 3-8 inch Water Meter Box
W-24 Trough Frame Pedestrian Loading Access Single Door
W-25 Trough Frame Pedestrian Loading Access Double Door
W-26 Access Door Cross Reference Chart
W-27 Temporary Jumper Connection
W-28 Contractors' Installation Requirements for a 2 inch Temporary Meter
W-29 Locator Tape/Tracewire Installation for Water Main Pipelines
 
Reclaimed Water Details
Jump to: • Sewer • Potable Water • Reclaimed Water • Miscellaneous • Roadway • Storm Drainage
Click on the file icons below to download specific files.
 RW-1 Reclaimed Water Design Notes
 RW-2 Reclaimed Water Construction Notes
 RW-3 Reclaimed Water Approved Products
RW-4 Reclaimed Water Meter Mox Layout
RW-5 Reclaimed Water Service: Irrigation (Sprinkler) Connection
RW-6 Reclaimed Water Lateral Service: (2 inch Meter)
RW-7 Reclaimed Water Service: Single Service (C.D.R. Meter Box)
RW-8 Reclaimed Water Service: Double Service (C.D.R. Meter Box)
RW-9 Reclaimed Water Main Valve Box
RW-10 Reclaimed Water Blow-Off
RW-11 Reclaimed Water Valve andValve Box (4-16 inch Valve Sizes)
RW-12 Locator Tape/Tracerwire Installation for Reclaimed Water, Pipelines
 
Miscellaneous Details
Jump to: • Sewer • Potable Water • Reclaimed Water • Miscellaneous • Roadway • Storm Drainage
Click on the file icons below to download specific files.
 M-1 Requirements for As-Built Drawings
M-2 Plan Sheet Requirements
M-3 Sidewalk Construction Requirements
M-4 Sidewalk and Bike Path Ramp
M-5 Sidewalk and Bike Path Ramp
M-6 Driveway Apron
M-7 Private Parking Lot
M-8 Concrete Wheel Stop
M-9 Road Barricade
M-10 Handicap Accessible Parking Spaces
M-11 Handicap Accessible Parking Spaces
M-12 Handicap Sign
M-13 Dumpster Pad
M-14 Street and Walkway Lights
  M-15 Reserved
M-16 Street and Walkway Lights 'Gardco Lighting'
M-17 Street and Walkway Lights 'Lumec Lighting'
M-18 Sidewalk Construction at Intersections
M-19 Sidewalk Construction at Intersections
M-20 Fiber Optic Cable & Handholes
M-21 Fiber Optic Cable & Handholes Notes
M-22 Stabilized Walking Path
M-23 One and Two Family Residential Grading Lot
M-24 Street and Walkway Lights 'Traditional Post Top'
M-25 Temporary Construction Fence
 
Roadway Details
Jump to: • Sewer • Potable Water • Reclaimed Water • Miscellaneous • Roadway • Storm Drainage
Click on the file icons below to download specific files.
R-1 50' or 60' R/W Road Section
R-2 60' R/W with Ditch Road Section
R-3A 80' R/W with Median and Ditch Road Section
R-3B 80' R/W with Median and Ditch Road Section
R-4A 100' R/W with 5 Lane Road Section
R-4B 100' R/W with 5 Lane Road Section
R-5 100' R/W with 4 Lane and Median Road Section
R-6 Roadway Geometry
R-7 Standard Cul-de-sac Detail with Single Storm Inlet
R-8 Standard Cul-de-sac Detail with Double Storm Inlet
R-9 Standard Curb Construction
R-10 Roadway Intersection Valley Gutter
R-11 Pavement Butt Joint
R-12 Roadway and Parking Area Design and Construction Notes
R-13 Roadway and Parking Area Design and Construction Notes
R-14 Roadway and Parking Area Design and Construction Notes
R-15 Roadway and Parking Area Design and Construction Notes
R-16 Roadway and Parking Area Design and Construction Notes
R-17 Roadway and Parking Area Design and Construction Notes
R-18 Technical Specifications for Site Plans and Subdiv. Testing
R-19 Concrete Pavement Details
R-20 Subdivision Technical Specifications; Sodding, Seeding and Mulching
R-21A Roadway and Miscellaneous Landscaping Design and Construction Notes
R-21B Roadway and Miscellaneous Landscaping Design and Construction Notes
R-22 Silt Fence Turbidity Barrier
R-23 Tree Protection Barricade
R-24 Floating Turbidity Barrier
R-25 Contractor Requirements for Site Clearing, Grading, and Erosion Control Design and Construction Notes
R-26 Contractor Requirements for Site Clearing, Grading, and Erosion Control Design and Construction Notes
R-27 Temporary Gravel Construction Entrance
 
Storm Drainage Details
Jump to: • Sewer • Potable Water • Reclaimed Water • Miscellaneous • Roadway • Storm Drainage
Click on the file icons below to download specific files.
ST-1 Storm Inlet Apron
ST-2 Concrete Spillway
ST-3 Pavement Trench Restoration
ST-4 Storm Drainage Design and Construction Notes
ST-5 Storm Drainage Design and Construction Notes
ST-6 Storm Drainage Design and Construction Notes
ST-7 Canal and Waterway Design and Construction Notes
ST-8 Bridge Design and Construction Notes
ST-9 Dry Retention Pond
ST-10 Wet Retention Pond
ST-11 Type C Storm Inlet
ST-12 Type E Storm Inlet
 
Important Numbers
Main Number
386-506-5500

Customer Service
(Water / Sewer/ Garbage Bill Questions & Payments)
386-506-5720

Community Development & Building Permits
386-506-5600

Code Compliance Hotline
386-506-5604

Fire Administration
386-506-5900

Parks & Recreation
386-506-5850

Parks & Recreation Afterhours
386-756-7400

Police Department
386-506-5800

Police Non-Emergency & Animal Control
386-756-7400

Public Utilities
386-506-5750

Public Utilities Afterhours
386-756-5380

Public Works
386-506-5575

Public Works Afterhours
386-756-7400

City Manager,
Mayor & City Council

386-506-5501

Click here to go to the Stormwater Management page


City Tweets
Police Tweets
668.6076. Public records status of e-mail addresses; agency website notice: Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing.