Administration directs the planning and coordination of the five divisions. (Water Production, Reclaimed Water, Lab Operation, Water Distribution and Maintenance Division) as well as right of way permitting.
The Field Operations section is responsible for ensuring the distribution of finished potable and reclaimed water to residents and businesses, as well as the collection and transmission of wastewater back to the wastewater facility for treatment.
The Water Production Division is responsible for the operation of 3 remote water storage tanks and pumping facilities located in Daytona Beach Shores, Ponce Inlet and Cypress Head subdivision. The three tanks have a combined capacity of 4.5 million gallons.